Enbridge Clipper Expansion
The status, timeline and source of this project. A free account opens every field.
Source: Bird Construction
Bird worked with Enbridge to meet their goal to increase the Alberta Clipper Pipeline capacity from 450,000 barrels-per-day to 800,000 barrels-per-day of heavy crude oil through increased pumping horsepower. The Canadian portion of the pipeline is over 1,000 kilometres long, transporting crude oil from the Hardisty terminal in Alberta to the Gretna station in Manitoba.
- Status
- Unknown
- Sector
- Oil and Gas
- Location
- Canada
- Updated
- 22 Jul 2026
- Source
- Bird Construction
ConstructChat
Ask ConstructChat about Enbridge Clipper Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | unknown |
Taiyo status | Unknown |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bird worked with Enbridge to meet their goal to increase the Alberta Clipper Pipeline capacity from 450,000 barrels-per-day to 800,000 barrels-per-day of heavy crude oil through increased pumping horsepower. The Canadian portion of the pipeline is over 1,000 kilometres long, transporting crude oil from the Hardisty terminal in Alberta to the Gretna station in Manitoba. |
Location
Country | Canada |
Source
Source reliability | High |
Source | Bird Construction |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2023-11-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
