Enbridge Great Lakes Tunnel Project
Sector: Oil and Gas • Location: Michigan, United States
Source: Detroit Free Press
The project involves constructing a concrete-lined tunnel up to 250 feet below the lake bed in the Straits of Mackinac to house a new oil pipeline. This tunnel will replace the 73-year-old Line 5 twin pipelines operating on the Straits lake bottom, aiming to reduce risks of anchor strikes and oil spills.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves constructing a concrete-lined tunnel up to 250 feet below the lake bed in the Straits of Mackinac to house a new oil pipeline. This tunnel will replace the 73-year-old Line 5 twin pipelines operating on the Straits lake bottom, aiming to reduce risks of anchor strikes and oil spills. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
