Enbridge Great Lakes Tunnel Project
Sector: Oil and Gas • Location: Mackinac Straits, Michigan, United States
Source: AOL
The project involves constructing a massive tunnel to carry the Line 5 pipeline underneath the Straits of Mackinac, aiming to reduce spill risks. The tunnel will be bored into rock 60 to 250 feet under the lakebed, spanning 4.5 miles between Lakes Michigan and Huron, and constructed from the south side to the northern shores.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves constructing a massive tunnel to carry the Line 5 pipeline underneath the Straits of Mackinac, aiming to reduce spill risks. The tunnel will be bored into rock 60 to 250 feet under the lakebed, spanning 4.5 miles between Lakes Michigan and Huron, and constructed from the south side to the northern shores. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
