Enbridge Line 5 Pipeline Tunnel Replacement
Sector: Cement • Location: Mackinaw City, Michigan, United States
Source: miningjournal.net
Enbridge Energy plans to replace a 4-mile segment of the Line 5 pipeline under the Straits of Mackinac with a segment buried in a concrete tunnel beneath the lakebed. A new alternative involving horizontal directional drilling through a narrow borehole underground is also being considered. The project aims to reduce the risk of oil spills in the Great Lakes.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under review |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Enbridge Energy plans to replace a 4-mile segment of the Line 5 pipeline under the Straits of Mackinac with a segment buried in a concrete tunnel beneath the lakebed. A new alternative involving horizontal directional drilling through a narrow borehole underground is also being considered. The project aims to reduce the risk of oil spills in the Great Lakes. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
