Enbridge Line 5 Reroute Project
Planned · Wisconsin · Last reported Oct 2025
Source: Wisconsin Public Radio
Enbridge proposes a $450 million project to build a new 41-mile segment of the Line 5 oil and gas pipeline rerouted around the Bad River tribe's reservation. The project involves crossing close to 200 waterways and affecting around 101 acres of wetlands in Ashland and Iron counties, including blasting bedrock and drilling in waterways and wetlands upstream from the reservation and wild rice beds.
- Status
- Prospective
- Sector
- Consumer Products, Metal, Oil and Gas, Steel
- Location
- Ashland, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Wisconsin Public Radio
ConstructChat
Ask ConstructChat about Enbridge Line 5 Reroute Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Enbridge proposes a $450 million project to build a new 41-mile segment of the Line 5 oil and gas pipeline rerouted around the Bad River tribe's reservation. The project involves crossing close to 200 waterways and affecting around 101 acres of wetlands in Ashland and Iron counties, including blasting bedrock and drilling in waterways and wetlands upstream from the reservation and wild rice beds. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Ashland |
Source
Source | Wisconsin Public Radio |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Metal, Oil and Gas, Steel |
Article published date | 2025-11-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
