Enbridge Line 5 Tunnel Project
Sector: Oil and Gas • Location: Traverse City, Michigan, United States
Source: Michigan Public
Enbridge proposes rerouting its 72-year-old Line 5 oil and natural gas liquids pipeline through a newly constructed tunnel beneath the Straits of Mackinac, a four-mile-wide waterway connecting Lake Michigan to Lake Huron. The project involves drilling a tunnel to house the pipeline instead of leaving it on the lake bed.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Enbridge proposes rerouting its 72-year-old Line 5 oil and natural gas liquids pipeline through a newly constructed tunnel beneath the Straits of Mackinac, a four-mile-wide waterway connecting Lake Michigan to Lake Huron. The project involves drilling a tunnel to house the pipeline instead of leaving it on the lake bed. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
