logo
ProjectPlanned

Enbridge Mainline Optimization Project Phase 1

Sector: Oil and Gas • Location: Illinois, Canada, United States

Source: Global News

A US$1.4-billion plan approved by Enbridge to add 150,000 barrels per day of capacity to its cross-Canada oil transport system and 100,000 barrels per day to the Flanagan South system, enabling greater oil flow from Illinois to the U.S. Gulf Coast. The capacity additions are expected to be available by 2027.

Status
Prospective
Sector
Oil and Gas
Location
Illinois, Canada
Updated
22 Jul 2026
Source
Global News

ConstructChat

Ask ConstructChat about Enbridge Mainline Optimization Project Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Enbridge Mainline Optimization Project Phase 1” is an infrastructure initiative in the Oil and Gas sector, located in Illinois, Canada, United States. Taiyo aggregates data on it from Global News.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A US$1.4-billion plan approved by Enbridge to add 150,000 barrels per day of capacity to its cross-Canada oil transport system and 100,000 barrels per day to the Flanagan South system, enabling greater oil flow from Illinois to the U.S. Gulf Coast. The capacity additions are expected to be available by 2027.

Original sector

Energy and Utilities

Budget

Location

Country

Canada

State

Illinois

Source

Source

Global News

URL

More Details

Record type

Project

Sector

Oil and Gas

Article published date

2026-04-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project