logo

Encruzo Novo Transmissora de Energia

One of 10,000+ projects Taiyo tracks in Brazil.

Source: World Bank Group

Project
Active

In December 2010, the company Elecnor Transmissao de Energia S.A., a subsidiary of the Spanish group Elecnor, was awarded in a competitive bidding process the contract to build and operate 240 km of transmission lines and one substation located in the state of Maranhão.

Besides Elecnor, other companies took part in the contest: the Spanish company Cobra Instalaciones y Servicios; the Brazilia

Status
Prospective
Sector
Commercial, Government, Power Generation (CCGT), Steel, Manufacturing (Industrial)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Encruzo Novo Transmissora de Energia

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Encruzo Novo Transmissora de Energia” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In December 2010, the company Elecnor Transmissao de Energia S.A., a subsidiary of the Spanish group Elecnor, was awarded in a competitive bidding process the contract to build and operate 240 km of transmission lines and one substation located in the state of Maranhão. Besides Elecnor, other companies took part in the contest: the Spanish company Cobra Instalaciones y Servicios; the Brazilian state-owned company ELETRONORTE; the Brazilian companies Alupar Investimento, FR Incorporadora, Transmissora Aliança de Energia Elétrica and ATP Engenharia. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. Elecnor presented the lowest offer, a total value of US$ 4.1 million (BRL 8.1 million), 33.95 % below the ceiling set by the regulatory agency. The 30-year contract was signed in June 2010, and the sponsors created the company Encruzo Novo Transmissora de Energia Ltda. The sponsor committed to invest US$ 43.1 million (BRL 85.17 million) in the project. In October 2012, the state-owned bank BNDES approved a US$ 27.2 million (BRL 53 million) loan to the project. Operation was set to start in May 2012, but actually started in July 2012. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Government, Power Generation (CCGT), Steel, Manufacturing (Industrial)

Article published date

2024-06-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project