logo
ProjectClosed

ENDE IV

Sector: Water Supply and Storage • Location: Bolivia

Source: World Bank Group

The proposed project consists of the following elements: (a) expansion of the Santa isabel hydroelectric power station, including a third unit (18 MW) and the installation of a second penstock; (b) construction of a compensating pond with a capacity of 100,000 m3, to be located at the Santa Isabel power station intake and to store water from the Corani power station; (c) collection of water from t

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Wind, Tunnel, Residential, Hydro, Government, Commercial
Location
Bolivia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about ENDE IV

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ENDE IV” is an infrastructure initiative in the Water Supply and Storage sector, located in Bolivia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project consists of the following elements: (a) expansion of the Santa isabel hydroelectric power station, including a third unit (18 MW) and the installation of a second penstock; (b) construction of a compensating pond with a capacity of 100,000 m3, to be located at the Santa Isabel power station intake and to store water from the Corani power station; (c) collection of water from the two arms of the Vinto River at a maximum discharge rate of 3m3/second for diversion to the Santa Isabel tunnel; (d) installation of a gas turbine with a capacity of approximately 22 MW at the Santa Cruz power station; (e) construction of a single circuit 115 KV transmission line, 150 km long, between the Sacaba and Vinto substations; and (f) construction of the Vinto substation, expansion of the Cochabamba and Sacaba substations and installation of shunt capacitors at the Oruro substations.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Bolivia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Wind, Tunnel, Residential, Hydro, Government, Commercial

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project