logo

ENDE IV

Sector: Water Supply and Storage • Location: Bolivia

Source: World Bank Group

Project
Closed

The proposed project consists of the following elements: (a) expansion of the Santa isabel hydroelectric power station, including a third unit (18 MW) and the installation of a second penstock; (b) construction of a compensating pond with a capacity of 100,000 m3, to be located at the Santa Isabel power station intake and to store water from the Corani power station; (c) collection of water from t

Project Information FAQ

Project Information

5 Q
The project “ENDE IV” is an infrastructure initiative in the Water Supply and Storage sector, located in Bolivia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project consists of the following elements: (a) expansion of the Santa isabel hydroelectric power station, including a third unit (18 MW) and the installation of a second penstock; (b) construction of a compensating pond with a capacity of 100,000 m3, to be located at the Santa Isabel power station intake and to store water from the Corani power station; (c) collection of water from the two arms of the Vinto River at a maximum discharge rate of 3m3/second for diversion to the Santa Isabel tunnel; (d) installation of a gas turbine with a capacity of approximately 22 MW at the Santa Cruz power station; (e) construction of a single circuit 115 KV transmission line, 150 km long, between the Sacaba and Vinto substations; and (f) construction of the Vinto substation, expansion of the Cochabamba and Sacaba substations and installation of shunt capacitors at the Oruro substations.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data