Enderby Outdoor Pool
One of 10,000+ projects Taiyo tracks in British Columbia.
Source: Infrastructure Canada
The project will increase access to recreation by constructing a new pool in Enderby. The new pool will replace the existing pool that was constructed in 1954 and has been used beyond its normal lifespan. The pool is a vital hub of the community, with users across generations, backgrounds, and needs, who rely upon it for their physical fitness and social interactions. The project works will includ
- Status
- Prospective
- Sector
- Hydro, Biomass, Commercial, Road, Government
- Location
- British Columbia, Canada
- Updated
- 19 Nov 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Enderby Outdoor Pool
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project will increase access to recreation by constructing a new pool in Enderby. The new pool will replace the existing pool that was constructed in 1954 and has been used beyond its normal lifespan. The pool is a vital hub of the community, with users across generations, backgrounds, and needs, who rely upon it for their physical fitness and social interactions. The project works will include: - site preparation; - construction of an approx. 390 m2 building including lifeguard room, universal change rooms, mechanical and storage; - construction of an approx. 5-lane lap pool; - construction of an approx. 258 m2 leisure pool including a zero-entry (beach) access, hydro-therapeutic lazy river and bubbler bench, and parent-and-tot area; - installation of a hot tub; - construction of a pool deck; - installation of a perimeter fence/gate; - connection to a zero-emission high-efficiency biomass district heating system for the building and pool; - surrounding site restoration; and, - all related works. |
Original sector | Community, Culture and Recreation |
Budget |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Hydro, Biomass, Commercial, Road, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
