Endesa and Sonnedix 150 MW Virtual Hybrid Solar-Plus-Storage PPA
Sector: Energy Storage • Location: Spain and Portugal
Source: ESS News
A 150 MW virtual hybrid Power Purchase Agreement (PPA) signed between Endesa and Sonnedix, covering a portfolio of solar and battery assets across Spain and Portugal. This project represents a hybrid solar-plus-storage system gaining traction in the European PPA market to mitigate price pressures on standalone solar projects.
- Status
- Closed
- Sector
- Energy Storage, Power Generation (CCGT), Solar
- Location
- Spain
- Updated
- 22 Jul 2026
- Source
- ESS News
ConstructChat
Ask ConstructChat about Endesa and Sonnedix 150 MW Virtual Hybrid Solar-Plus-Storage PPA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 150 MW virtual hybrid Power Purchase Agreement (PPA) signed between Endesa and Sonnedix, covering a portfolio of solar and battery assets across Spain and Portugal. This project represents a hybrid solar-plus-storage system gaining traction in the European PPA market to mitigate price pressures on standalone solar projects. |
Original sector | Energy |
Location
Country | Spain |
Source
Source | ESS News |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Solar |
Article published date | 2026-05-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in Spain and Portugal
- Iberian Electricity Grid Voltage Control Enhancement
- IGNIS Solar and Hybrid Renewable Energy Projects
- Galp Energy Storage Projects in Spain and Portugal
- Battery Storage Optimization Expansion in Spain and Portugal
- Iberian Peninsula Power Grid Blackout
- Hybrid Solar and Battery Energy Storage PPAs in Europe
- Galp 73MW/147MWh Grid-Forming Battery Energy Storage System (BESS) Projects
