ENEA - DIVERTOR TOKAMAK TEST FACILITY
One of 10,000+ projects Taiyo tracks in Italy.
Source: European Investment Bank (EIB)
The project consists of the design and construction of the Divertor Tokamak Test facility ("DTT"), a research infrastructure that is aimed at contributing to the realisation of fusion energy. This project includes the design and construction of a tokamak, which is a doughnut-shape device, where a set of magnetic fields confine the hydrogen isotopes mix, brought at 150 million degrees in the form
- Status
- Under Construction
- Sector
- Geothermal, Hydrogen, Power Generation (CCGT), Government
- Location
- Italy
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about ENEA - DIVERTOR TOKAMAK TEST FACILITY
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the design and construction of the Divertor Tokamak Test facility ("DTT"), a research infrastructure that is aimed at contributing to the realisation of fusion energy. This project includes the design and construction of a tokamak, which is a doughnut-shape device, where a set of magnetic fields confine the hydrogen isotopes mix, brought at 150 million degrees in the form of plasma, keeping it away from the wall of the plasma chamber. The divertor is the region of the tokamak, where the magnetic field lines are diverted in order to realise a 'channel' where plasma thermal power is conveyed and exhausted. This project will be realised in Frascati, (Lazio Region, central Italy) at an existing site of the Promoter. |
Original sector | Services |
Location
Country | Italy |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Geothermal, Hydrogen, Power Generation (CCGT), Government |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Geothermal projects in Italy
- GECO (site 4)
- Sannazzaro Refinery
- UFI FILTERS RDI
- ITALIAN MEDIUM SIZED RENEWABLES FRAMEWORK LOAN
- Torrevaldaliga Nord Power Plant Unit II
- Acerra Biomass Power Plant Phase I
- San Vittore Waste to Energy Plant Phase I
- Development and application of mitigation and adaptation strategies and measures for counteracting the global Urban Heat Islands phenomenon
