Enel X Demand Response Project
Sector: Commercial • Location: Australia
Source: Australian Renewable Energy Agency (ARENA)
Enel X (formerly EnerNOC), a global leader in demand response, is one of the eight companies contracted under the Demand Response initiative to trial how it can play a role in stabilising the grid in extreme peaks. Enel X is contracted to deliver 20 MW in New South Wales and 30 MW in Victoria in each of the three years of the trial.How the project worksThe combined 50 MW demand response portfolio
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Enel X (formerly EnerNOC), a global leader in demand response, is one of the eight companies contracted under the Demand Response initiative to trial how it can play a role in stabilising the grid in extreme peaks. Enel X is contracted to deliver 20 MW in New South Wales and 30 MW in Victoria in each of the three years of the trial.How the project worksThe combined 50 MW demand response portfolio consists of commercial and industrial energy users who have agreed to safely reduce their electricity consumption during demand response events dispatched by AEMO.Having installed its own metering technology at customer sites, energy users are capable of implementing load curtailment within 10 minutes of receiving dispatch instructions from Enel X indicating that a demand response event is commencing. In addition, a portion of the sites have also been equipped with control equipment that allows Enel X to remotely initiate a safe load reduction.Participating businesses are able to maximise payments from utilities for partially powering down operations during moments of severe grid strain. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
