Energía Cinco Estrellas, S.A. de C.V.

One of 3,451 projects Taiyo tracks in Honduras.

Source: International Finance Corporation (IFC)

The Aura Solar II project (the “Project” or the “Company”) entails the development of a photovoltaic solar plant with capacity of 61MWdc/50MWac by the Sponsors. The plant is in stage of design and is expected to begin construction in Q4 2014. It will be sited in the Choluteca Municipality near the El Carrizo community, which is approximately located 152 km south of the capital city of Tegucigalpa.

Status
Closed
Sector
Raw Materials, Road, Power Generation (CCGT), Solar, Government
Location
Honduras
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Energía Cinco Estrellas, S.A. de C.V.

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Energía Cinco Estrellas, S.A. de C.V.” is an infrastructure initiative in the Raw Materials sector, located in Honduras. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Aura Solar II project (the “Project” or the “Company”) entails the development of a photovoltaic solar plant with capacity of 61MWdc/50MWac by the Sponsors. The plant is in stage of design and is expected to begin construction in Q4 2014. It will be sited in the Choluteca Municipality near the El Carrizo community, which is approximately located 152 km south of the capital city of Tegucigalpa. Aura Solar II is expected to generate approximately 125 GWh per annum. The Project will be located over an area of 150 hectares of modified habitat and agricultural pasture land. The Project will be interconnected to Santa Lucia - an existing substation located in the outskirts of Choluteca - via dedicated 34.5 kV single pole transmission lines with a length of 11 km, along an existing road. Given the peri-urban siting of the Santa Lucia substation, the last 50 meters of the transmission line will be buried. The equipment for the Project will consist of proven ground mounted photovoltaic crystalline modules, and integrated inverter and transformation centers. Construction is expected to be completed by Q2 2015.

Original sector

V-BF - Solar - Renewable Energy Generation

Location

Country

Honduras

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Raw Materials, Road, Power Generation (CCGT), Solar, Government

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project