Energía Cinco Estrellas, S.A. de C.V.

Sector: Raw Materials • Location: Honduras

Source: International Finance Corporation (IFC)

Project
Completed

The Aura Solar II project (the “Project” or the “Company”) entails the development of a photovoltaic solar plant with capacity of 61MWdc/50MWac by the Sponsors. The plant is in stage of design and is expected to begin construction in Q4 2014. It will be sited in the Choluteca Municipality near the El Carrizo community, which is approximately located 152 km south of the capital city of Tegucigalpa.

Project Information FAQ

Project Information

4 Q
The project “Energía Cinco Estrellas, S.A. de C.V.” is an infrastructure initiative in the Raw Materials sector, located in Honduras. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Aura Solar II project (the “Project” or the “Company”) entails the development of a photovoltaic solar plant with capacity of 61MWdc/50MWac by the Sponsors. The plant is in stage of design and is expected to begin construction in Q4 2014. It will be sited in the Choluteca Municipality near the El Carrizo community, which is approximately located 152 km south of the capital city of Tegucigalpa. Aura Solar II is expected to generate approximately 125 GWh per annum. The Project will be located over an area of 150 hectares of modified habitat and agricultural pasture land. The Project will be interconnected to Santa Lucia - an existing substation located in the outskirts of Choluteca - via dedicated 34.5 kV single pole transmission lines with a length of 11 km, along an existing road. Given the peri-urban siting of the Santa Lucia substation, the last 50 meters of the transmission line will be buried. The equipment for the Project will consist of proven ground mounted photovoltaic crystalline modules, and integrated inverter and transformation centers. Construction is expected to be completed by Q2 2015.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data