Energeon Ampara Biomass Plant
Sector: Power Generation (CCGT) • Location: Sri Lanka
Source: World Bank Group
EnerGeon Ampara Power (Pvt.) Ltd., developed the 9.75MW Ampara biomass plant. Annual output was expected to be 68 million kWh. The project was to be fueled from sustainable short rotation coppice (SRC) plantations.
The plant reportedly started activity in June 2007. Project operating life is 25 years.
The project applied for UNFCCC CDM funding. The counterparty was the IBRD administered Danish C
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | EnerGeon Ampara Power (Pvt.) Ltd., developed the 9.75MW Ampara biomass plant. Annual output was expected to be 68 million kWh. The project was to be fueled from sustainable short rotation coppice (SRC) plantations. The plant reportedly started activity in June 2007. Project operating life is 25 years. The project applied for UNFCCC CDM funding. The counterparty was the IBRD administered Danish CDM fund. Total cost was unknown, but estimated at US$13 million (based on $1.3 million/ MW, the lowest average recorded cost by PPIRE in 2011 - in LAC). EnerGeon filed an identical CDM application for a project named Uhana. The project is identical in every way, and the location is exactly the same. This implies both projects are the same project. http://newcdmprojects.in/ampara-small-scale-biomass-power-project/ http://www.dnv.com/focus/climate_change/upload/ss-pdd-%20uhana-september%2029.pdf http://cdm.unfccc.int/Projects/Validation/DB/I2HSYSFJROR8G0ZUMLS2E02X08J2B7/view.html http://www.dnv.com/focus/climate_change/Upload/SS-PDD-%20ampara%20-%20September%2029.pdf |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
