logo

Energeon Ampara Biomass Plant

Sector: Biomass • Location: Sri Lanka

Source: World Bank Group

Project
Active

EnerGeon Ampara Power (Pvt.) Ltd., developed the 9.75MW Ampara biomass plant. Annual output was expected to be 68 million kWh. The project was to be fueled from sustainable short rotation coppice (SRC) plantations.

The plant reportedly started activity in June 2007. Project operating life is 25 years.

The project applied for UNFCCC CDM funding. The counterparty was the IBRD administered Danish C

Project Information FAQ

Project Information

5 Q
The project “Energeon Ampara Biomass Plant” is an infrastructure initiative in the Biomass sector, located in Sri Lanka. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

EnerGeon Ampara Power (Pvt.) Ltd., developed the 9.75MW Ampara biomass plant. Annual output was expected to be 68 million kWh. The project was to be fueled from sustainable short rotation coppice (SRC) plantations. The plant reportedly started activity in June 2007. Project operating life is 25 years. The project applied for UNFCCC CDM funding. The counterparty was the IBRD administered Danish CDM fund. Total cost was unknown, but estimated at US$13 million (based on $1.3 million/ MW, the lowest average recorded cost by PPIRE in 2011 - in LAC). EnerGeon filed an identical CDM application for a project named Uhana. The project is identical in every way, and the location is exactly the same. This implies both projects are the same project. http://newcdmprojects.in/ampara-small-scale-biomass-power-project/ http://www.dnv.com/focus/climate_change/upload/ss-pdd-%20uhana-september%2029.pdf http://cdm.unfccc.int/Projects/Validation/DB/I2HSYSFJROR8G0ZUMLS2E02X08J2B7/view.html http://www.dnv.com/focus/climate_change/Upload/SS-PDD-%20ampara%20-%20September%2029.pdf

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data