logo

Energetica Serra da Prata (ESPRA)

Sector: Water Supply and Storage • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company Consorcio Enerbras and WM (Enerbras Comercializadora de Energia Ltda. and Water Mark Engenharia e Sistemas Ltda.) was granted authorizations to build three small hydro power plants located in the state of Bahia (41.8 MW in total capacity). The 30-year contracts were signed with the federal regulatory agency ANEEL in December 2003. In the same year, a Specific Purpose Company

Project Information FAQ

Project Information

4 Q
The project “Energetica Serra da Prata (ESPRA)” is an infrastructure initiative in the Water Supply and Storage sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Brazilian company Consorcio Enerbras and WM (Enerbras Comercializadora de Energia Ltda. and Water Mark Engenharia e Sistemas Ltda.) was granted authorizations to build three small hydro power plants located in the state of Bahia (41.8 MW in total capacity). The 30-year contracts were signed with the federal regulatory agency ANEEL in December 2003. In the same year, a Specific Purpose Company was created to managed the projects: Energetica Serra da Prata (ESPRA). The Brazilian company Renova Energia S.A. initially owned 86% of ESPRA’s shares, but by 2006 Renova acquired ESPRA’s entire control. The power plants began construction in 2006, and all three units became operational in January 2008. They are located in the state of Bahia: PCH Colino I (11MW) and PCH Colino II (16MW) at Colino river and PCH Cachoeira da Lixa (14.8MW) at Jucurucu river. Energetica Serra da Prata S.A. committed to invest US$ 86.7 million (BRL 189.2 million) in the construction of the three PCHs. In July 2006, ESPRA signed a US$ 58.2 million (BRL 127 million) contract with BNB (Banco do Nordeste), the Northeastern Region Development Bank. The amount was released through FNE, a fund designed to finance renewable energy sources. All PCH´s signed power purchase agreements with the state-owned company Eletrobras for 20 years through the Brazilian Federal program PROINFA (incentive program for alternative power generating companies).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data