Energized & De-Energized Power Line Construction
Closed · Texas · Last reported Oct 2024
Source: Dodge USA
Energized and De-energizedpower Line Construction and Storm Restoration, Including Overhead and Underground Installation. The Work Will Be Performed in Midsouths Service Territory Which Includes Grimes, Montgomery, Madison, Walker, Brazos and Waller Counties.
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Power Transmission, Commercial
- Location
- Huntsville, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Energized & De-Energized Power Line Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Energized and De-energizedpower Line Construction and Storm Restoration, Including Overhead and Underground Installation. The Work Will Be Performed in Midsouths Service Territory Which Includes Grimes, Montgomery, Madison, Walker, Brazos and Waller Counties. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Huntsville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Power Transmission, Commercial |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
