Energo-SAS Sasaj SHPP

Sector: Water Supply and Storage • Location: Albania

Source: World Bank Group

Project
Active

Energo-SAS developed the 8.6MW Sasaj small hydropower plant, in Saranda District, Southern Albania. Annual output was estimated at 38 GWh. Energo-SAS is a subsidiary of AGNA group. The project consisted of 2x 4,000kW. Energo-SAS was the project company, established in April 2006.

The project was commissioned in June 2012. The project was to be used for irrigation purposes during May/September and

Status
Prospective
Sector
Water Supply and Storage, Hydro, Power Generation (CCGT), Government, Commercial
Location
Albania
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Energo-SAS Sasaj SHPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Energo-SAS Sasaj SHPP” is an infrastructure initiative in the Water Supply and Storage sector, located in Albania. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Energo-SAS developed the 8.6MW Sasaj small hydropower plant, in Saranda District, Southern Albania. Annual output was estimated at 38 GWh. Energo-SAS is a subsidiary of AGNA group. The project consisted of 2x 4,000kW. Energo-SAS was the project company, established in April 2006. The project was commissioned in June 2012. The project was to be used for irrigation purposes during May/September and for generation purposes between October/May. The project was connected to the national grid via an existing 35kV transmission line, rehabilitated for the projects purpose. The project received the BOO concession in September 2003. The construction license was received in January 2009. The environmental license was received in August 2007. The generation license was received in November 2006. Construction was initially expected to be completed in September 2010. Commissioning was reported in June 2012. ERE issued Standard Basic PPA with Public Wholesale Supplier (KESH) for small HPPs. Total project cost was EUR 8.5 million (US$10.6 million). Financing was provided by Raiffeisen Bank. Financial closure date was unavailable, estimated here is June 2012, commissioning date. http://www.agnagroup.com/new/foto/uploads/File/SASAJ%20Project.pdf The Corporate Wire, Albania Says 8.5 mln euro sasaj HPP comes on stream, 4 June 2012.

Original sector

Energy

Procurement method

Budget

Location

Country

Albania

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Hydro, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project