Energo-SAS Sasaj SHPP
Sector: Water Supply and Storage • Location: Albania
Source: World Bank Group
Energo-SAS developed the 8.6MW Sasaj small hydropower plant, in Saranda District, Southern Albania. Annual output was estimated at 38 GWh. Energo-SAS is a subsidiary of AGNA group. The project consisted of 2x 4,000kW. Energo-SAS was the project company, established in April 2006.
The project was commissioned in June 2012. The project was to be used for irrigation purposes during May/September and
- Status
- Prospective
- Sector
- Water Supply and Storage, Hydro, Power Generation (CCGT), Government, Commercial
- Location
- Albania
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Energo-SAS Sasaj SHPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Energo-SAS developed the 8.6MW Sasaj small hydropower plant, in Saranda District, Southern Albania. Annual output was estimated at 38 GWh. Energo-SAS is a subsidiary of AGNA group. The project consisted of 2x 4,000kW. Energo-SAS was the project company, established in April 2006. The project was commissioned in June 2012. The project was to be used for irrigation purposes during May/September and for generation purposes between October/May. The project was connected to the national grid via an existing 35kV transmission line, rehabilitated for the projects purpose. The project received the BOO concession in September 2003. The construction license was received in January 2009. The environmental license was received in August 2007. The generation license was received in November 2006. Construction was initially expected to be completed in September 2010. Commissioning was reported in June 2012. ERE issued Standard Basic PPA with Public Wholesale Supplier (KESH) for small HPPs. Total project cost was EUR 8.5 million (US$10.6 million). Financing was provided by Raiffeisen Bank. Financial closure date was unavailable, estimated here is June 2012, commissioning date. http://www.agnagroup.com/new/foto/uploads/File/SASAJ%20Project.pdf The Corporate Wire, Albania Says 8.5 mln euro sasaj HPP comes on stream, 4 June 2012. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Albania |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hydro, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
