logo

Energo-SAS Sasaj SHPP

Sector: Hydro • Location: Albania

Source: World Bank Group

Project
Active

Energo-SAS developed the 8.6MW Sasaj small hydropower plant, in Saranda District, Southern Albania. Annual output was estimated at 38 GWh. Energo-SAS is a subsidiary of AGNA group. The project consisted of 2x 4,000kW. Energo-SAS was the project company, established in April 2006.

The project was commissioned in June 2012. The project was to be used for irrigation purposes during May/September and

Project Information FAQ

Project Information

5 Q
The project “Energo-SAS Sasaj SHPP” is an infrastructure initiative in the Hydro sector, located in Albania. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Energo-SAS developed the 8.6MW Sasaj small hydropower plant, in Saranda District, Southern Albania. Annual output was estimated at 38 GWh. Energo-SAS is a subsidiary of AGNA group. The project consisted of 2x 4,000kW. Energo-SAS was the project company, established in April 2006. The project was commissioned in June 2012. The project was to be used for irrigation purposes during May/September and for generation purposes between October/May. The project was connected to the national grid via an existing 35kV transmission line, rehabilitated for the projects purpose. The project received the BOO concession in September 2003. The construction license was received in January 2009. The environmental license was received in August 2007. The generation license was received in November 2006. Construction was initially expected to be completed in September 2010. Commissioning was reported in June 2012. ERE issued Standard Basic PPA with Public Wholesale Supplier (KESH) for small HPPs. Total project cost was EUR 8.5 million (US$10.6 million). Financing was provided by Raiffeisen Bank. Financial closure date was unavailable, estimated here is June 2012, commissioning date. http://www.agnagroup.com/new/foto/uploads/File/SASAJ%20Project.pdf The Corporate Wire, Albania Says 8.5 mln euro sasaj HPP comes on stream, 4 June 2012.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data