ENERGY EFFICIENCY (ELETROBRAS)
Sector: Power Generation (CCGT) • Location: Brazil
Source: World Bank Group
The Energy Efficiency Project aims at increasing the efficiency of energy production and use in Brazil. The first phase is to demonstrate cost-effective measures in the electricity sub-sector through load management and targeted peak period reductions so as to better utilize existing facilities; demonstrate the same to reduce energy use in public, residential, commercial, and industrial facilities
- Status
- Closed
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government, Residential
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ENERGY EFFICIENCY (ELETROBRAS)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Energy Efficiency Project aims at increasing the efficiency of energy production and use in Brazil. The first phase is to demonstrate cost-effective measures in the electricity sub-sector through load management and targeted peak period reductions so as to better utilize existing facilities; demonstrate the same to reduce energy use in public, residential, commercial, and industrial facilities; enhance standards and labeling programs; and set up a market-based support structure for energy service companies. Project components will consist of Demonstration Projects as follows: 1) Proper electricity price signals and service options will target selected electricity energy markets to test and demonstrate innovative demand charge and time-of-day-tariffs, load demand limiters, options in service conditions, and other commercial actions. 2) Delivery mechanisms for dissemination of emerging technologies will test delivery mechanisms to increase the use of more efficient appliances, equipment, and operational practices. |
Original sector | Energy and Extractives |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government, Residential |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
