logo

Energy efficiency in public buildings and renewable energies in the district heating sector (Greening the Public Sector)

Sector: Aerospace & Defense • Location: Serbia

Source: KFW Bank aus Verantwortung

Project
Active

The FZ project is the energy renovation and refurbishment of the largest and most important hospital in Serbia, the Military Medical Academy (VMA) in Belgrade. The VMA has around 1,200 beds and covers an area of around 180,000m² and 15 floors. Although the hospital is owned by the Serbian Ministry of Defense (MoD), the VMA's services are mainly aimed at civilians (90% of all treatments). After 38

Project Information FAQ

Project Information

5 Q
The project “Energy efficiency in public buildings and renewable energies in the district heating sector (Greening the Public Sector)” is an infrastructure initiative in the Aerospace & Defense sector, located in Serbia. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The FZ project is the energy renovation and refurbishment of the largest and most important hospital in Serbia, the Military Medical Academy (VMA) in Belgrade. The VMA has around 1,200 beds and covers an area of around 180,000m² and 15 floors. Although the hospital is owned by the Serbian Ministry of Defense (MoD), the VMA's services are mainly aimed at civilians (90% of all treatments). After 38 years of operation without any significant renovations, the VMA's buildings and facilities have reached the end of their service life. The hospital-specific standards common in the EU (e.g. hygiene, fire protection) are not met to an adequate extent. The hospital's electricity consumption is around twice as high and its water consumption four times as high as in hospitals in the Federal Republic of Germany. The loss of steam alone on the 1.5 km long pipe between the hospital's own gas-fired district heating plant and the building is on average 25% and around 40% on winter days. Against this background, an energy renovation of the VMA is urgently required and will lead to high energy savings. Compared to other energy efficiency measures in public buildings, the renovation work during uninterrupted hospital operations is to be classified as exceptionally challenging, multi-faceted and complex. The renovation is to be carried out in stages, on the one hand to ensure the operational capability of this system-relevant hospital, and on the other hand to spread the investment burden over several financial years.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data