Energy Efficiency in Public Buildings Program
Sector: Solar • Location: Philippines
Source: Asian Development Bank (ADB)
The Energy Efficiency in Public Buildings Results-Based Lending (EEPB-RBL) will support the Government of the Philippines in implementing the Government Energy Management Programme (GEMP) which requires all government buildings to reduce their monthly energy consumption by at least 10%. This requirement is being enforced under the Philippines Energy Efficiency and Conservation Act. The EEPB-RBL ai
- Status
- Prospective
- Sector
- Solar, Residential, Electric Vehicles (EVs), Oil and Gas, Automotive, Power Generation (CCGT), Commercial, Government, Education, Natural Gas
- Location
- Philippines
- Updated
- 22 Jul 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about Energy Efficiency in Public Buildings Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Energy Efficiency in Public Buildings Results-Based Lending (EEPB-RBL) will support the Government of the Philippines in implementing the Government Energy Management Programme (GEMP) which requires all government buildings to reduce their monthly energy consumption by at least 10%. This requirement is being enforced under the Philippines Energy Efficiency and Conservation Act. The EEPB-RBL aims to deliver approximately 20-30% energy savings in existing public buildings through the procurement and installation of energy efficient lighting, high efficiency air conditioning, distributed solar photovoltaic modules, smart metering and/or electric vehicle charging stations. The project will focus particularly on existing education and health related buildings. The total project cost is $500 million implemented over a period of five years. The first phase will cover about 100 buildings from 2026-2028 and the second phase will cover about 300 buildings from 2028 to 2031. |
Original sector | Energy |
Budget |
Location
Country | Philippines |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Solar, Residential, Electric Vehicles (EVs), Oil and Gas, Automotive, Power Generation (CCGT), Commercial, Government, Education, Natural Gas |
Article published date | 2024-12-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
