Energy Efficiency Project

Sector: Power Generation (CCGT) • Location: Belarus

Source: World Bank Group

Project
Closed

The objective of the Energy Efficiency Project is to improve energy efficiency in heat and power generation in selected towns in Belarus. There are three components to the project. The first component is the conversion of existing heat-only-boiler plants to combined heat and power plants. The project will convert existing heat-only-boiler plants to combined heat and power plants at six sites. All

Project Information FAQ

Project Information

5 Q
The project “Energy Efficiency Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Belarus. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Energy Efficiency Project is to improve energy efficiency in heat and power generation in selected towns in Belarus. There are three components to the project. The first component is the conversion of existing heat-only-boiler plants to combined heat and power plants. The project will convert existing heat-only-boiler plants to combined heat and power plants at six sites. All plants will use natural gas as the main fuel. The largest plant will be in Borisov with a combined heat and power (CHP) unit with an electricity capacity of about 65 MW, followed by the Mogilev combined cycle CHP plant of 15.5 MW of electricity capacity. The introduction of combined heat and power generation will improve efficiency of the plants and thus reduce gas consumption. The second component is the design and supervision consultancy. The design and supervision consultancy will be performed by Belarusian design institutes and financed by the Belarusian side. In addition, the component will also finance construction management and investment monitoring. Finally, the third component is the project Implementation and management. A Project Management Unit (PMU) will carry out the procurement, contract supervision, and financial management of the project including auditing and other fiduciary requirements.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data