logo
ProjectClosed

Energy Efficiency Project

One of 3,021 projects Taiyo tracks in Serbia.

Source: World Bank Group

The development objective of the project is to improve energy efficiency in heating buildings in order to make heating more affordable as well as improve the functional and health environment of the users. An important associated objective is to reduce the local and global environmental impact of the use of dirty fuels for heating buildings in Serbia. The project has the following three components

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Hospital, Residential, Government, Education
Location
Serbia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Energy Efficiency Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Energy Efficiency Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Serbia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the project is to improve energy efficiency in heating buildings in order to make heating more affordable as well as improve the functional and health environment of the users. An important associated objective is to reduce the local and global environmental impact of the use of dirty fuels for heating buildings in Serbia. The project has the following three components: Component (i). Environmental Improvement, Rehabilitation of the Heat Supply System, and Energy Efficiency Improvements in the Clinical Center. The Clinical Center complex includes 76 buildings, with a total covered area of 391 thousand square meters, spread over an area of 38 hectares. These buildings include hospitals, specialized clinics, faculties and research institutes, as well as administration, service and storage buildings. The energy supply services within the Clinical Center of Serbia (CCS) consist of heat supply from 19 separate boiler plants (some more than 40 years old, using lignite and heavy oil) comprising of total 72 boiler units with a variety of unit sizes. Electricity is supplied to the CCS, through underground cables, by the local power distribution company. The heat is distributed either by steam or by hot water through pipes mainly laid in channel beds. The annual fuel consumption of the heat plant is about 11,500 tons of heavy fuel oil, 650 tons of light fuel oil and 6,850 tons of coal, for which storage facilities are also provided. Component (ii). Energy Efficiency Improvements in Social Service buildings (Schools and Hospitals) across Serbia. This component will finance the installation of energy efficiency equipment and retrofitting in schools and hospitals. The initial investment program consists of 17 primary schools with heated floor space of about 51,000 m2 and 12 hospital buildings with a total heated floor space of about 68,000 m2. A total of about 60-70 buildings and the heating systems which supply them would be retrofitted over the five year implementation period. Component (iii): Technical Assistance. Technical assistance provided through the project would help Serbian Energy Efficiency Agency (SEEA) to develop monitoring and evaluation capacity, training and communications activities that it would use not only for the implementation of the proposed IDA project but also for follow on activities, in particular for the residential consumers.

Original sector

FY17 - Energy and Extractives,FY17 - Public Administration

Budget

Location

Country

Serbia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Hospital, Residential, Government, Education

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project