Energy Efficiency Sector Programme Power Transmission
Sector: Power Generation (CCGT) • Location: Albania
Source: KFW Bank aus Verantwortung
As part of the FC measure Energy Efficiency Sector Programme Power Transmission, the electricity transmission network in Albania is to be modernised and expanded. The planned investments are necessary to maintain the Albanian energy infrastructure and reduce electricity supply bottlenecks. The two components (i) 220 kV transmission line Tirana - Rrashbull and (ii) 110 kV Tirana Ring are to be impl
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | As part of the FC measure Energy Efficiency Sector Programme Power Transmission, the electricity transmission network in Albania is to be modernised and expanded. The planned investments are necessary to maintain the Albanian energy infrastructure and reduce electricity supply bottlenecks. The two components (i) 220 kV transmission line Tirana - Rrashbull and (ii) 110 kV Tirana Ring are to be implemented under the programme. The objectives of the programme are to increase electricity transmission capacities in Albania (particularly in the area surrounding Tirana and Rrashbull) and to improve the security and quality of supply in Albania's electricity transmission system. The overarching development policy programme objectives are to contribute to global climate protection by reducing CO2 emissions and promoting the sustainable economic development of Albania. The estimated total costs amount to around EUR 45.0 million. The borrower and programme sponsor is the Albanian electricity transmission company Operatori Sistemit Transmetimit (OST). The programme is to be financed by a development credit (low-interest loan) of up to EUR 40 million. The sponsoring organisation OST's own contribution will amount to EUR 5 million. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
