logo
ProjectClosed

ENERGY I

Sector: Water Supply and Storage • Location: Bulgaria

Source: World Bank Group

The project's objectives are to: (a) improve the operating efficiency and reliability of the power system, thus reducing supply disruptions; (b) improve voltage control and frequency regulation; (c) realign the level and structure of electricity tariffs to the level and structure of electricity tariffs to rationalize consumption of electricity, reduce imports, reduce the pollution associated with

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Power Generation (CCGT), Hydro, Government, Commercial
Location
Bulgaria
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about ENERGY I

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ENERGY I” is an infrastructure initiative in the Water Supply and Storage sector, located in Bulgaria. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project's objectives are to: (a) improve the operating efficiency and reliability of the power system, thus reducing supply disruptions; (b) improve voltage control and frequency regulation; (c) realign the level and structure of electricity tariffs to the level and structure of electricity tariffs to rationalize consumption of electricity, reduce imports, reduce the pollution associated with electricity generation, and mobilize resources for the Natsionalna Elektricheska Kompania (NEK); (d) improve and depoliticize the tariff setting system; (e) reduce the need for electricity imports or other high cost sources to meet peak demand; (f) reorient the operations of NEK along more commercial lines; and (g) strengthen dam safety at the Belmeken and Chaira dams and associated saddle dam. The project consists of three components. First is improvement of the supervisory control and transmission network systems for NEK. The second is completion of units 3 and 4 of the pumped storage project at Chaira, which is owned by NEK. Third is technical assistance, primarily to help NEK in operating more efficiently and in a more commercial manner.

Original sector

Energy and Extractives

Budget

Location

Country

Bulgaria

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Power Generation (CCGT), Hydro, Government, Commercial

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project