logo

ENERGY I

Sector: Power Generation (CCGT) • Location: Madagascar

Source: World Bank Group

Project
Closed

The First Energy Project operation carries through, at the project level, one of the central themes of the IDA country strategy; supporting sectoral strategies aimed at rehabilitating productive infrastructure and establishing the conditions for long-term growth. The main objectives of the proposed project are to help improve the reliability of power production and supply throughout the country a

Project Information FAQ

Project Information

5 Q
The project “ENERGY I” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Madagascar. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The First Energy Project operation carries through, at the project level, one of the central themes of the IDA country strategy; supporting sectoral strategies aimed at rehabilitating productive infrastructure and establishing the conditions for long-term growth. The main objectives of the proposed project are to help improve the reliability of power production and supply throughout the country and the power sector's financial and operational performance; maximize the efficient use of locally available and economically accessible energy resources; and strengthen energy sector planning capability. To this end, the project specifically entails two main components involving the energy sector as a whole and the power subsector in particular. Within the latter component, the project involves generation rehabilitation and expansion; transmission and substation improvement; distribution rehabilitation and expansion and improvement in general plant and services. In addition, this component includes power sector institution building; power sector studies; and an electric boiler program. For the energy sector as a whole, the project entails providing equipment for production of pine charcoal and rice husk briquettes and technical assistance with sector studies.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data