logo

Energy Infrastructure Modernization at Ave Maria University

Sector: Education • Location: Ave Maria, Florida, United States

Source: MarketScreener

Project
Completed For First Two Phases; Planned For Third Phase

Ameresco, Inc. completed two integrated design-build projects at Ave Maria University in Florida to modernize the university's building infrastructure. The first phase implemented a new building automation system integrating HVAC equipment across five campus buildings, improving occupant comfort and operational control with projected annual savings of $200,000. The second phase upgraded exterior l

Status
Under Construction
Sector
Education, Power Transmission, Power Generation (CCGT), Commercial
Location
Ave Maria, Florida, United States of America
Updated
22 Jul 2026
Source
MarketScreener

ConstructChat

Ask ConstructChat about Energy Infrastructure Modernization at Ave Maria University

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Energy Infrastructure Modernization at Ave Maria University” is an infrastructure initiative in the Education sector, located in Ave Maria, Florida, United States. Taiyo aggregates data on it from MarketScreener.

Participants

Not available for this record.

Status

Original status

completed for first two phases; planned for third phase

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Ameresco, Inc. completed two integrated design-build projects at Ave Maria University in Florida to modernize the university's building infrastructure. The first phase implemented a new building automation system integrating HVAC equipment across five campus buildings, improving occupant comfort and operational control with projected annual savings of $200,000. The second phase upgraded exterior lighting to improve visibility and safety. A third phase is planned to add a 3,000-ton chiller to the central utility plant, increasing capacity from 3,600 to 6,600 tons, ensuring system redundancy and improved efficiency across 17 facilities, with construction expected to complete in 2026.

Original sector

Energy

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Ave Maria

Source

Source

MarketScreener

URL

More Details

Record type

Project

Sector

Education, Power Transmission, Power Generation (CCGT), Commercial

Article published date

2025-09-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project