Energy Sector Capacity Building Project (ESCBP)
Sector: Water Supply and Storage • Location: Tanzania
Source: World Bank Group
The development objective of the Energy Sector Capacity Building Project for Tanzania is to strengthen the capacity of the Government of Tanzania (GoT) to develop its natural gas sub-sector, and Public Private Partnerships (PPP) for the power generation sector. The project has five components, with multiple sub-components. Component A is petroleum policy and legal framework. This component has two
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Natural Gas, Commercial, Waste Processing and Treatment, Government, Education
- Location
- Tanzania
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Energy Sector Capacity Building Project (ESCBP)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective of the Energy Sector Capacity Building Project for Tanzania is to strengthen the capacity of the Government of Tanzania (GoT) to develop its natural gas sub-sector, and Public Private Partnerships (PPP) for the power generation sector. The project has five components, with multiple sub-components. Component A is petroleum policy and legal framework. This component has two sub-components: (A1) petroleum policy and strategy to maximize value arising from natural gas development (financial, social, and environmental); and (A2) the legal and regulatory framework for the gas subsector reflects the Government´s policies and strategies for this sub-sector and therein, attracts foreign and local investments. Component B is strengthening institutional sector management, coordination and governance. This component has four sub-components: (B1) strengthening sector coordination and governance; (B2) enhancing organizational capacity; (B3) environmental and social management; and (B4) health and safety management. Component C is education and skills development. This component addresses the increase in availability of vocational training capacity for the gas sub-sector of Tanzania in alignment with the projection of employment growth in the public and private parts of the sub-sector. Component D is power generation and natural gas PPP projects capacity building. This component has two sub-components: (D1) Ministry of Energy and Minerals (MEM) PPP node support; and (D2) Tanzania Electric Supply Company Limited (TANESCO) PPP node support. Component E is project coordination. This component supports the Project Steering Committee as well as the Project Management Teams (PMT) of the four Implementing Agencies (IAs), namely MEM, TANESCO, Tanzania Petroleum Development Corporation (TPDC) and Energy and Water Utilities Regulatory Authority (EWURA). It will enhance the IAs capacity for procurement and financial management, through the provision of technical advisory services, training, operating costs, acquisition of goods and a vehicle for the MEM project coordinator. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Tanzania |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Oil and Gas, Natural Gas, Commercial, Waste Processing and Treatment, Government, Education |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Tanzania
- Open for FDI through a minority stake/Development of a new project/Processing and preserving of fish and fish products/BLUE PROCESSING COMPANY .LTD
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of plastics products/Jafnob Printing and Packaging Ltd
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of soap and detergents, cleaning and polishing preparations, perfumes and toilet preparations/NCG CHEMICAL INDUSTRIES
- Dar es Salaam Water Distribution
- Silverlands Tanzania Limited
- Kahama Mining Corp. Ltd.
- Tabora Water Supply Scheme, Tanzania
