logo
ProjectActive

Energy Sector Development Project

One of 765 projects Taiyo tracks in Tuvalu.

Source: World Bank Group

The objective of the Energy Sector Development Project for Tuvalu is to enhance Tuvalu’s energy security by reducing its dependence on imported fuel for power generation and by improving the efficiency and sustainability of its electricity system. This project consists of the following three components: Component 1. Renewable Energy Investments. Supply and installation, for Tuvalu Electricity Corp

Status
Prospective
Sector
Solar, Energy Storage, Power Generation (CCGT), Wind, Forest Products and Packaging, Telecommunications, Commercial, Hydro, Government
Location
Tuvalu
Updated
19 Nov 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Energy Sector Development Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Energy Sector Development Project” is an infrastructure initiative in the Solar sector, located in Tuvalu. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The objective of the Energy Sector Development Project for Tuvalu is to enhance Tuvalu’s energy security by reducing its dependence on imported fuel for power generation and by improving the efficiency and sustainability of its electricity system. This project consists of the following three components: Component 1. Renewable Energy Investments. Supply and installation, for Tuvalu Electricity Corporation (TEC), of power-generation and grid-management equipment to increase the contribution of renewable energy in Tuvalu’s hybrid generation system and to reduce diesel generation. This equipment will include (a) solar photovoltaic (PV) and wind-power generation; (b) batteries, sufficient for the hybrid system’s storage requirements, including the expected energy spillovers from the New Zealand and Masdar solar PV systems that are now being built without storage; (c) battery inverters and an integrated power control system to provide grid stability and other ancillary services; and (d) a satellite-based communications system on Funafuti and three of the seven outer islands. Component 2. Energy Efficiency Investments. A program of activities designed to enhance efficient use of energy will be carried out. These activities include: (a) Supply and installation of prepayment meters for TEC consumers and smart meters for the largest electricity consumers; (b) Supply and installation of selected energy efficiency (EE) investments, such as enhanced insulation in buildings to be selected by TEC in accordance with criteria agreed with the Bank, and replacement of inefficient lighting and appliances in said buildings; (c) Development of policy, standards and labeling for EE; and (d) Activities aimed at raising consumer awareness on EE and related capacity-building activities and training. Component 3. Technical Assistance and Project Management Support. A program of activities designed to enhance the capacity of TEC and other Government of Tuvalu staff for project implementation will be carried out. These activities include coordination, administration, technical operation, procurement, financial management, environmental and social management, monitoring, evaluation, and reporting.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Tuvalu

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Energy Storage, Power Generation (CCGT), Wind, Forest Products and Packaging, Telecommunications, Commercial, Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project