logo

Energy Sector Project

Sector: Water Supply and Storage • Location: Mongolia

Source: World Bank Group

Project
Closed

The Energy Project aims at reducing electricity losses, and improving electric power revenue collection in Mongolia, through an increased reliability on, and financial sustainability of the electricity distribution companies. The project components are: 1) Assistance provision to the Ulaanbaatar Electricity Distribution Office (UBEDO) for the improvement of its power distribution systems, revenue

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government, Residential
Location
Mongolia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Energy Sector Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Energy Sector Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Mongolia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Energy Project aims at reducing electricity losses, and improving electric power revenue collection in Mongolia, through an increased reliability on, and financial sustainability of the electricity distribution companies. The project components are: 1) Assistance provision to the Ulaanbaatar Electricity Distribution Office (UBEDO) for the improvement of its power distribution systems, revenue collection, and commercialization aspects. Investments in technical loss reduction include the installation of distribution transformers, mid-voltage set-ups, and, installation of low-voltage lines. Based on international commercial standards, non-technical loss reduction will be accomplished by installing new meters - to be controlled by UBEDO - which includes metering of residential customers in the Ger area, in apartments owned by former housing companies, and commercial, and industrial customers. Technical assistance (TA), and capacity building for commercialization will include management practices, energy economics, and technical skills. 2) TA, training, and technical services will improve electricity distribution in the provinces ("aimags") through the installation, and reconfiguration of meters, and connections, and of various low-voltage lines; pipeline replacements, installation of pumps in canal sections, and, the installation of heat meters will improve heat distribution systems. 3) Regulatory support, and financial management to the Energy Authority will be provided in the form of staff training to develop institutional capacity, and, through the introduction of an independent external auditor, to provide international best practices in financial management.

Original sector

FY17 - Energy and Extractives,FY17 - Public Administration

Budget

Location

Country

Mongolia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government, Residential

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project