Energy Sector Project
Sector: Water Supply and Storage • Location: Mongolia
Source: World Bank Group
The Energy Project aims at reducing electricity losses, and improving electric power revenue collection in Mongolia, through an increased reliability on, and financial sustainability of the electricity distribution companies. The project components are: 1) Assistance provision to the Ulaanbaatar Electricity Distribution Office (UBEDO) for the improvement of its power distribution systems, revenue
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government, Residential
- Location
- Mongolia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Energy Sector Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Energy Project aims at reducing electricity losses, and improving electric power revenue collection in Mongolia, through an increased reliability on, and financial sustainability of the electricity distribution companies. The project components are: 1) Assistance provision to the Ulaanbaatar Electricity Distribution Office (UBEDO) for the improvement of its power distribution systems, revenue collection, and commercialization aspects. Investments in technical loss reduction include the installation of distribution transformers, mid-voltage set-ups, and, installation of low-voltage lines. Based on international commercial standards, non-technical loss reduction will be accomplished by installing new meters - to be controlled by UBEDO - which includes metering of residential customers in the Ger area, in apartments owned by former housing companies, and commercial, and industrial customers. Technical assistance (TA), and capacity building for commercialization will include management practices, energy economics, and technical skills. 2) TA, training, and technical services will improve electricity distribution in the provinces ("aimags") through the installation, and reconfiguration of meters, and connections, and of various low-voltage lines; pipeline replacements, installation of pumps in canal sections, and, the installation of heat meters will improve heat distribution systems. 3) Regulatory support, and financial management to the Energy Authority will be provided in the form of staff training to develop institutional capacity, and, through the introduction of an independent external auditor, to provide international best practices in financial management. |
Original sector | FY17 - Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | Mongolia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government, Residential |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
