logo

Energy Sector Support and Investment Project

Sector: Power Transmission • Location: Togo

Source: World Bank Group

Project
Closed

The development objective of the Energy Sector Support and Investment Project for Togo is to improve the operational performance of the power sector and increase access to electricity in the capital city, Lomé. The project has three components. First component, power distribution improvement and expansion will finance the priority rehabilitation and reinforcement of the medium voltage (MV) and low

Project Information FAQ

Project Information

5 Q
The project “Energy Sector Support and Investment Project” is an infrastructure initiative in the Power Transmission sector, located in Togo. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The development objective of the Energy Sector Support and Investment Project for Togo is to improve the operational performance of the power sector and increase access to electricity in the capital city, Lomé. The project has three components. First component, power distribution improvement and expansion will finance the priority rehabilitation and reinforcement of the medium voltage (MV) and low voltage (LV) systems in Lomé, and the expansion of the network with new connections. The component is composed of three sub components, which are founded on the results of the EU‐funded prefeasibility study mentioned above, as well as a Lomé MV network modeling exercise which identified the requirements for grid strengthening by 2020.The component is divided in three sub components: (i) rehabilitation of MV and LV Systems in Lomé, (ii) reinforcement of the Lomé MV Network; and (iii) network extension and new connections. Second component, power sector reform are focused around four main areas (i) reform of the Compagnie Energie Electrique du Togo (CEET) and its relationship with the Government of Togo (GoT) with the preparation and implementation of a Management Improvement Plan (MIP) as well as a review and reinforcement of the existing Revenue Protection Program targeting large customers and government electricity bill payment; (ii) planning, with the preparation of a master plan for generation, transmission, and distribution, and the strengthening of the planning capacities of the Ministère des Mines et de l’Energie (MME) and CEET; (iii) preparation of a sector financial model and viability assessment; and (iv) a review of the sector legal and regulatory framework; (v) preparation of a diagnostic study of CEB and the implementation of reforms identified; and (vi) review of the performance contract with CEET. Third component, project management and capacity building will finance project supervision and implementation management activities, including operational expenses, vehicles, offices equipment, and project supervision and project management capacity building. This component has three sub components, (i) engineering consulting will support the implementation agency in the activities included under first component through the recruitment of an owner’s engineer to assist the implementation agency in technical issues and in the procurement process; (ii) implementation management activities will support various operating costs of the project management team (e.g., office equipment, project software, a project vehicle) and the external project audits; and (iii) capacity building activities will include staff training related to utility management and/or project implementation (e.g., procurement, financial management (FM), monitoring and evaluation (M&E), software systems).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data