logo
ProjectClosed

Energy Sector Technical Assistance 2 Project

One of 937 projects Taiyo tracks in Kosovo.

Source: World Bank Group

The Second Energy Sector Technical Assistance Project for Kosovo aims to assist in (i) developing capacity for a commercially sustainable exchange of power with the regional system, and optimizing utilization of existing generation capacity through economic dispatch; and (ii) developing a framework for attracting private sector investment in the energy sector. There are three project components id

Status
Closed
Sector
Power Generation (CCGT), Commercial, Government
Location
Kosovo
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Energy Sector Technical Assistance 2 Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Energy Sector Technical Assistance 2 Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Kosovo. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Second Energy Sector Technical Assistance Project for Kosovo aims to assist in (i) developing capacity for a commercially sustainable exchange of power with the regional system, and optimizing utilization of existing generation capacity through economic dispatch; and (ii) developing a framework for attracting private sector investment in the energy sector. There are three project components identified on the basis of the ESTAP-I Energy Sector Study (December, 2002) and discussions with the Government. Component 1 prepares a detailed feasibility report for a 400 kV transmission interconnection between Kosovo and Albania taking into account regional perspective, and developing an approach for commercially sustainable terms of exchange of power with the neighboring systems. The feasibility study will be conducted in coordination with Albania. Component 2 prepares a bankable project for establishment of a dispatch center in Kosovo. Component 3 assists in developing a policy, legal, regulatory, and institutional framework for private investment in the energy sector. The Terms of Reference for Component 3 are currently being developed. The TORS will include, inter alia, a review from the perspective of foreign private investors of issues such as applicable commercial law, business registration, currency regime and profit repatriation; access to international finance and guarantees; applicable investment protection treaties; ownership of property laws relating to securing of obligations, concessions, leases and mortgages; energy sector regulation, licensing, energy trading, regulatory institution; labor laws affecting foreign private investment; dispute resolution systems; taxation (export and import duties, value-added taxes, presumptive and profit taxes, personal income tax etc., municipal taxes, royalties); and applicable environmental regulation, etc.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Kosovo

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project