logo

Energy Sector Technical Assistance Project

Sector: Power Generation (CCGT) • Location: Kosovo

Source: World Bank Group

Project
Closed

The Energy Sector Technical Assistance Project will assist in the development of satisfactory long-term plans, for the economically efficient reconstruction, rehabilitation, and restructuring of the power, lignite, and district heating, in addition to the petroleum sectors, and the development of a natural gas sector. The project consists of a technical assistance (TA) component to prepare an ener

Status
Closed
Sector
Power Generation (CCGT), Oil and Gas, Natural Gas, Geothermal, Government
Location
Kosovo
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Energy Sector Technical Assistance Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Energy Sector Technical Assistance Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Kosovo. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Energy Sector Technical Assistance Project will assist in the development of satisfactory long-term plans, for the economically efficient reconstruction, rehabilitation, and restructuring of the power, lignite, and district heating, in addition to the petroleum sectors, and the development of a natural gas sector. The project consists of a technical assistance (TA) component to prepare an energy sector study. The study would have thirteen modules as follows: 1) develop a household energy survey to evaluate feasibility, and costs of alternative energy sources; 2) determine production capability of existing power generating facilities, and identify options for future power generating capacity; 3) prepare alternative programs for rehabilitation, and expansion of the power transmission system, and analyze least-cost power generation investments to determine expansion plans; 4) analyze technical losses in power transmission, and distribution, to propose immediate long-term measures on loss reduction targets, and costs; 5) evaluate the feasibility of a new System Control and Data Acquisition (SCADA), and associated telecommunications facilities for power system dispatching; 6) prioritize investment requirements in distribution capacity; 7) propose a lignite mine development strategy for supply to existing thermal power stations; 8) evaluate the current state of district heating facilities, and compare competitiveness with other heating options; 9) investigate the technical, and economic feasibility of importing natural gas to Kosovo, estimating gas demand, and required pipeline infrastructure; 10) estimate future demand for petroleum products; 11) based on the above modules, prepare recommendations on investment plans for power and energy sub-sectors; 12) estimate economic costs of electricity, and tariff structures, based on least-cost generation/transmission programs; and, 13) examine the organizational, and operational structure of energy companies, including recommendations towards company autonomy, corporatization, commercialization, competition, and privatization.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Kosovo

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Oil and Gas, Natural Gas, Geothermal, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project