logo
ProjectIn Exploratory, Pending Final Review

Energy Valley

One of 5,002 projects Taiyo tracks in Egypt.

Source: European Bank for Reconstruction and Development (EBRD)

The project includes the development, construction and operation by Scatec of a 1.95 GW solar PV plant and 3.935 MWh BESS with associated grid connection. The project will be implemented in 4 locations:

Site 1: Hybrid – Minya site: 1.95 GW solar PV and 1.5 GWh BESS located in East Minya. Site 2: Consumer substation: 500/220/22 kV Sub-station and 500 kV, 2.5 km Overhead Transmission line located

Status
Prospective
Sector
Water Supply and Storage, Bridge, Solar, Government, Warehouse, Residential, Commercial, Road, Energy Storage, Power Generation (CCGT), Natural Gas, Manufacturing (Industrial)
Location
Egypt
Updated
19 Nov 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Energy Valley

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Energy Valley” is an infrastructure initiative in the Water Supply and Storage sector, located in Egypt. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

in exploratory, pending final review

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The project includes the development, construction and operation by Scatec of a 1.95 GW solar PV plant and 3.935 MWh BESS with associated grid connection. The project will be implemented in 4 locations: Site 1: Hybrid – Minya site: 1.95 GW solar PV and 1.5 GWh BESS located in East Minya. Site 2: Consumer substation: 500/220/22 kV Sub-station and 500 kV, 2.5 km Overhead Transmission line located in Al Sarirya. Site 3: Abu Qir: 1.435 GWh BESS, along with 33/220 kV substation located in Abo Qir, Alexandria. Site 4: Nagaa Hammadi: 1.0 GWh BESS along with a 33/220kV substation and Overhead Transmission Line located in Nagaa Hammadi, Qena. Download zip package in English Download zip package in Arabic and Client website: https://www.scatec.com/en/sustainability/esg-resources/ Environmental or social enquiries Shady Khafagy Scatec – Egypt Office Building 44, The Northern 90th street, banks center, New Cairo, Cairo post@scatec.com +47 480 85 500

Original sector

Energy

Location

Country

Egypt

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Bridge, Solar, Government, Warehouse, Residential, Commercial, Road, Energy Storage, Power Generation (CCGT), Natural Gas, Manufacturing (Industrial)

Article published date

2026-09-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project