Energy Vault 100MW/200MWh BESS for Jupiter Power in ERCOT
Sector: Energy Storage • Location: Fort Stockton, Texas, United States
Source: Energy-Storage.News
Energy Vault and Jupiter Power signed an agreement to supply an additional 100MW/200MWh battery energy storage system (BESS) at a Jupiter Power site in the ERCOT market, Texas. Construction is underway with expected operation by end of summer 2025. The system uses Energy Vault's UL9540-certified B-Vault solution and VaultOS EMS for operations.
- Status
- Under Construction
- Sector
- Energy Storage, Power Generation (CCGT)
- Location
- Fort Stockton, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Energy-Storage.News
ConstructChat
Ask ConstructChat about Energy Vault 100MW/200MWh BESS for Jupiter Power in ERCOT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Energy Vault and Jupiter Power signed an agreement to supply an additional 100MW/200MWh battery energy storage system (BESS) at a Jupiter Power site in the ERCOT market, Texas. Construction is underway with expected operation by end of summer 2025. The system uses Energy Vault's UL9540-certified B-Vault solution and VaultOS EMS for operations. |
Original sector | Energy Storage |
Location
Country | United States of America (USA) |
State | Texas |
City | Fort Stockton |
Source
Source | Energy-Storage.News |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT) |
Article published date | 2025-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
