logo
ProjectActive

Enerjisa Bares Wind Farm

One of 10,000+ projects Taiyo tracks in Turkey.

Source: World Bank Group

Enerjisa Enerji Uretim AS (Enerjisa) was planning the development of the 142.5MW Bares Wind Farm, in the Balikesir province, Western Turkey. Enerjisa was a joint-venture between Haci Omer Sabanci Holding AS (Sabanci) and Verbund International GmbH (Verbund), each holding 50%. Enerjisa acquired the project through acquiring Italgen Elektrik Uretim AS (Italgen), which held equity in the project comp

Status
Prospective
Sector
Hydro, Wind, Raw Materials, Power Generation (CCGT), Government, Commercial
Location
Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Enerjisa Bares Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Enerjisa Bares Wind Farm” is an infrastructure initiative in the Hydro sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Enerjisa Enerji Uretim AS (Enerjisa) was planning the development of the 142.5MW Bares Wind Farm, in the Balikesir province, Western Turkey. Enerjisa was a joint-venture between Haci Omer Sabanci Holding AS (Sabanci) and Verbund International GmbH (Verbund), each holding 50%. Enerjisa acquired the project through acquiring Italgen Elektrik Uretim AS (Italgen), which held equity in the project company: Bares Elektrik Uretimi AS (Bares). The project does not hold a PPA. The project reached financial closure in April 2012 under an A/B loan scheme with a direct loan from EBRD of EUR100 million (US$131 million) and a syndicated loan of EUR35 million (US$46 million), syndicated to BAWAG commercial bank. Tenor for both loans is 12 years. Debt/equity ratio is 60/40, because Enerjisa shareholders require overall leverage at max 60/40, and because the project holds no PPA. Total project cost US$ 299 million. In 2012, E.ON acquired Verbund's shares in Enerjisa in return for 8 run-of-river hydropower projects totalling 351MW in Germany as well as EUR300 million in cash payments. The swap was expected to be finalized in the first quarter of 2013 after approval from the European Commission. The plant was put into operation in May 2013. http://www.ebrd.com/english/pages/project/psd/2011/42978.shtml http://www.ebrd.com/pages/news/press/2012/120427.shtml http://www.pfie.com/story.aspx?storycode=21014700

Original sector

Energy

Budget

Location

Country

Turkey

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Wind, Raw Materials, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project