Enerjisa Bares Wind Farm
One of 10,000+ projects Taiyo tracks in Turkey.
Source: World Bank Group
Enerjisa Enerji Uretim AS (Enerjisa) was planning the development of the 142.5MW Bares Wind Farm, in the Balikesir province, Western Turkey. Enerjisa was a joint-venture between Haci Omer Sabanci Holding AS (Sabanci) and Verbund International GmbH (Verbund), each holding 50%. Enerjisa acquired the project through acquiring Italgen Elektrik Uretim AS (Italgen), which held equity in the project comp
- Status
- Prospective
- Sector
- Hydro, Wind, Raw Materials, Power Generation (CCGT), Government, Commercial
- Location
- Turkey
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Enerjisa Bares Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Enerjisa Enerji Uretim AS (Enerjisa) was planning the development of the 142.5MW Bares Wind Farm, in the Balikesir province, Western Turkey. Enerjisa was a joint-venture between Haci Omer Sabanci Holding AS (Sabanci) and Verbund International GmbH (Verbund), each holding 50%. Enerjisa acquired the project through acquiring Italgen Elektrik Uretim AS (Italgen), which held equity in the project company: Bares Elektrik Uretimi AS (Bares). The project does not hold a PPA. The project reached financial closure in April 2012 under an A/B loan scheme with a direct loan from EBRD of EUR100 million (US$131 million) and a syndicated loan of EUR35 million (US$46 million), syndicated to BAWAG commercial bank. Tenor for both loans is 12 years. Debt/equity ratio is 60/40, because Enerjisa shareholders require overall leverage at max 60/40, and because the project holds no PPA. Total project cost US$ 299 million. In 2012, E.ON acquired Verbund's shares in Enerjisa in return for 8 run-of-river hydropower projects totalling 351MW in Germany as well as EUR300 million in cash payments. The swap was expected to be finalized in the first quarter of 2013 after approval from the European Commission. The plant was put into operation in May 2013. http://www.ebrd.com/english/pages/project/psd/2011/42978.shtml http://www.ebrd.com/pages/news/press/2012/120427.shtml http://www.pfie.com/story.aspx?storycode=21014700 |
Original sector | Energy |
Budget |
Location
Country | Turkey |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Wind, Raw Materials, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
