Enerjisa Kavsakbendi HPP

Sector: Warehouse • Location: Turkey

Source: World Bank Group

Project
Active

Enerjisa was planning the development of the 183 MW Kavsakbendi hydropower plant, at Kavsak Kovaz, Adana, Southeast Turkey. Annual output for the project was estimated at 741 GWh. Enerjisa was a joint-venture between Austrian Verbund and Turkish Sabanci. The Sabanci family was Sabanci Holding’s major shareholder (60.6%). The remaining shares (39.4%) were traded on the Istanbul Stock Exchange, whic

Project Information FAQ

Project Information

5 Q
The project “Enerjisa Kavsakbendi HPP” is an infrastructure initiative in the Warehouse sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Enerjisa was planning the development of the 183 MW Kavsakbendi hydropower plant, at Kavsak Kovaz, Adana, Southeast Turkey. Annual output for the project was estimated at 741 GWh. Enerjisa was a joint-venture between Austrian Verbund and Turkish Sabanci. The Sabanci family was Sabanci Holding’s major shareholder (60.6%). The remaining shares (39.4%) were traded on the Istanbul Stock Exchange, which included 9.858% shares held by other family members previously registered to ISE. Verbund International GMBH was a wholly-owned subsidiary of VERBUND AG, and publicly traded on the Vienna Stock Exchange. The Austrian government held 51% of the shares. About 25% of the shares were held by the provincial energy suppliers TIWAG (5%), Wiener Stadtwerke Holding (10%) and EVN (10%). The remaining shares (24%) were free float. Commissioning was expected in 2013. The construction contract was awarded to AGE Construction in July 2009. A EUR100 million ($133 million) EPC contract was awarded to Alstom Hydro and GES for the Francis turbines and generators at the Kavsakbendi, Kopro and Menge plants under development by Enerjisa. The project was part of a $6.5 billion investment plan announced in October 2007, totalling 10 projects of 980 MW together. Financial closure for the second tranche was reached on March 24 2011, whilst the first was signed on June 13th 2008. The project was financed in combination with a natural gas power plant and ten hydropower plants. The second trache included the Dogancay hydropower plant, and the Mersin wind power plant. For the second tranche: total project cost was estimated at EUR1,000 million ($1.420 milion), for a total nameplate capacity of 1.000 MW. Loans were signed at a value of EUR700 million ($994 million), indicating a 70/30 debt to equity ratio. The financing was structured as an IFC A and B loan facility, a parallel loan facility and a DFI facility, provided by the International Finance Corporation IFC, WestLB AG and UniCredit Corporate and Investment Banking (UniCredit CAIB AG). The IFC A Loan totalled EUR75 million ($99.75 milion). The IFC B Loan totalled EUR530 million ($704.9 million), shared 50-50 by WestLB and UniCredit. The EUR65 million ($86.5 million) parallel loan was financed by TSBK. The maturity was establised at 12 years. The other mandated lead arrangers were KfW IPEX-Bank GmbH, the Industrial Development Bank of Turkey (TSBK), BAWAG PSK, ING Bank NV, FMO NV, Proparco, Bank Austria Creditanstalt AG, Erste Bank AG, Raiffeisen Zentral Bank Oesterreich AG, and Societe General. The second tranche was recorded as IFC Project number 29390. In the first tranche: total project costs were estimated at EUR1.4 billion ($2.0 billion). The IFC agreed to contribute $825 million, structured as a $200 million IFC A Loan, a $25 million IFC C Loan, and a $600 million IFC B Loan. Akbank T.A.S. arranged parallel financing totalling EUR402 million ($534.7 million), 12 year maturity, assisted by National Bank of Greece and the European Investment Bank EIB, who participated with EUR135 million ($179.6 million). The maturity was established at 12 years. Mandated Lead Arrangers for the first tranche B loan were: KfW IPEX-Bank GmbH, Bank Austria Creditanstalt AG, Erste Bank AG, ING Bank N.V., Raiffeisen Zentralbank Oesterreich AG, WestLB AG and Société Générale. The first tranche was recorded as IFC Project number 26016. The amounts in the PP fields are on a pro-rata MW basis (183/1000MW). In 2012, E.ON acquired Verbund's shares in Enerjisa in return for 8 run-of-river hydropower projects totalling 351MW in Germany as well as EUR300 million in cash payments. The swap was expected to be finalized in the first quarter of 2013 after approval from the European Commission.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data