logo
ProjectActive

Enerjisa Menge HPP

Active · Turkey

Source: World Bank Group

Enerjisa, a joint venture between Verbund (Austria) and Sabanci, developed the 89MW Menge hydropower plant, Seyhan River, Adapa, Southeast Turkey. The plant was expected to generate 202.6 GWh annually.

The project developer held a 49 year generation license for the project, awarded in July 2006 and acquired by Enerjisa in 2008. The construction contract was awarded and executed by Ozaltin, and C

Status
Prospective
Sector
Hydro, Wind, Power Generation (CCGT), Government, Commercial
Location
Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Enerjisa Menge HPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Enerjisa Menge HPP” is an infrastructure initiative in the Hydro sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Enerjisa, a joint venture between Verbund (Austria) and Sabanci, developed the 89MW Menge hydropower plant, Seyhan River, Adapa, Southeast Turkey. The plant was expected to generate 202.6 GWh annually. The project developer held a 49 year generation license for the project, awarded in July 2006 and acquired by Enerjisa in 2008. The construction contract was awarded and executed by Ozaltin, and Cengiz from June 2009, together with the Kopru plant on the same river. The equipment supply contract, as well as design and installation of the Francis turbines, was awarded to Alstom Hydro and GES under a EUR 100 million contract from December 2008, which also included the Kavsakbendi and Kopru plants. Construction started in May 2009. Commissioning was initially estimated at November 2011, but this became February 2012. Total cost was unknown, but estimated at US$1.7 million/MW, or US$151.3 million. Financial closure date was unavailable, but estimated at February 2012, commissioning date. In 2012, Verbund sold its shares in Enerjisa to E.ON in exchange for 8 hydropower plants in Germany and a cash sum. The deal was not finalized in 2012. http://www.eib.org/attachments/general/events/athens_28022012_akarca.pdf http://www.enerjisa.com.tr/Documents/Menge_HES.PDF

Original sector

Energy

Budget

Location

Country

Turkey

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Wind, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project