Enerjisa Menge HPP
Sector: Hydro • Location: Turkey
Source: World Bank Group
Enerjisa, a joint venture between Verbund (Austria) and Sabanci, developed the 89MW Menge hydropower plant, Seyhan River, Adapa, Southeast Turkey. The plant was expected to generate 202.6 GWh annually.
The project developer held a 49 year generation license for the project, awarded in July 2006 and acquired by Enerjisa in 2008. The construction contract was awarded and executed by Ozaltin, and C
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Enerjisa, a joint venture between Verbund (Austria) and Sabanci, developed the 89MW Menge hydropower plant, Seyhan River, Adapa, Southeast Turkey. The plant was expected to generate 202.6 GWh annually. The project developer held a 49 year generation license for the project, awarded in July 2006 and acquired by Enerjisa in 2008. The construction contract was awarded and executed by Ozaltin, and Cengiz from June 2009, together with the Kopru plant on the same river. The equipment supply contract, as well as design and installation of the Francis turbines, was awarded to Alstom Hydro and GES under a EUR 100 million contract from December 2008, which also included the Kavsakbendi and Kopru plants. Construction started in May 2009. Commissioning was initially estimated at November 2011, but this became February 2012. Total cost was unknown, but estimated at US$1.7 million/MW, or US$151.3 million. Financial closure date was unavailable, but estimated at February 2012, commissioning date. In 2012, Verbund sold its shares in Enerjisa to E.ON in exchange for 8 hydropower plants in Germany and a cash sum. The deal was not finalized in 2012. http://www.eib.org/attachments/general/events/athens_28022012_akarca.pdf http://www.enerjisa.com.tr/Documents/Menge_HES.PDF |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
