logo

Enerjisa Tufanbeyli Coal Plant

One of 67 projects Taiyo tracks in Adana.

Source: World Bank Group

Project
Active

Enerjisa Enerji Uretim AS (Turkey) was developing the 450MW Tufanbeyli lignite-fired thermal power plant, Tufanbeyli, Adana Region, Southern Turkey. The project was to consist of 3x 150MW generators using Circulating fluidized bed technology. Enerjisa is a joint-venture between Turkish Haci Omer Sabanci Holding AS, and Swiss Verbund AG.

Commissioning was expected for 2015, when the project was e

Status
Prospective
Sector
Geothermal, Hydro, Power Generation (CCGT), Commercial, Government
Location
Adana, Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Enerjisa Tufanbeyli Coal Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Enerjisa Tufanbeyli Coal Plant” is an infrastructure initiative in the Geothermal sector, located in Adana, Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Enerjisa Enerji Uretim AS (Turkey) was developing the 450MW Tufanbeyli lignite-fired thermal power plant, Tufanbeyli, Adana Region, Southern Turkey. The project was to consist of 3x 150MW generators using Circulating fluidized bed technology. Enerjisa is a joint-venture between Turkish Haci Omer Sabanci Holding AS, and Swiss Verbund AG. Commissioning was expected for 2015, when the project was expected to sell its output to the wholesale market without a purchasing guarantee. The coal was expected to be mined from a local surface mine, also expected to be operated by Enerjisa. The EPC contract was awarded to SK Engineering & Construction, from Korea, ITOCHU Corporation, from Japan, and SK E&C Engineering and Construction Company, from Turkey in 2011. Total value of the EPC contract was estimated at YEN 80 billion (US$817 million). The project seems to operate under a new "Royalty Model" from the Turkish Energy Ministry, where Turkish Coal Enterprises (TKI) receives royalties on electricity production instead of charging for the coal for a period of 30 years. The project reached financial closure on July 25th 2012, with a EUR750 million (US$921 million) financing package by a consortium of banks. The debt was split as follows: EUR750 million 11 year, and EUR350 million equity. The EUR750 million debt consisted of a EUR608 million insured portion, and a EUR 142 uncovered portion. The debt was distributed as follows: Akbank (EUR62 million), Bank of Tokyo Misubishi UFC (EUR94 million), HSBC (EUR 80 million as part of EUR608 million loan, and EUR20 million as part of EUR142 million laon), BNP Paribas (EUR 60 million as part of EUR608 million loan, and EUR30 million as part of EUR142 million loan), Deutsche Bank (EUR 50 million), Erste Bank (EUR 30 million), Natixis (EUR 40 million), Raiffeisenbank Hungary (EUR 94 million), Societe Generale (EUR 50 million), UniCredit Group (EUR 140 million). The project received a risk insurance on the EUR608 million portion of the loan from Korea Trade Insurance Corporation, covering 95%. Total project cost was estimated at EUR1.1 billion (US$1,350 million). Legal advisors to the project were Clifford Chance (Soc-Gen), Paul Hastings (K-sure), and White & Chase (Enerjisa). The expected coordinates were: 38.263333, 36.220556 In 2012, E.ON acquired Verbund's shares in Enerjisa in return for 8 run-of-river hydropower projects totaling 351MW in Germany as well as EUR300 million in cash payments. The swap was expected to be finalized in the first quarter of 2013 after approval from the European Commission. http://www.sourcewatch.org/index.php/Tufanbeyli_Power_Station http://www.thelawyer.com/clifford-chance-and-us-duo-fuel-750m-turkish-power-plant-financing/1014387.article http://www.law360.com/articles/364286/turkey-s-enerjisa-lands-921m-loan-for-thermal-plant http://www.itochu.co.jp/en/news/2011/110517.html http://www.banktrack.org/manage/ajax/ems_dodgydeals/createPDF/tufanbeyli_coal_power_plant

Original sector

Energy

Budget

Location

Country

Turkey

State

Adana

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Geothermal, Hydro, Power Generation (CCGT), Commercial, Government

Article published date

2024-05-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project