Enerjisa Uretim Wind Project
The status, timeline and source of this project. A free account opens every field.
Source: European Bank for Reconstruction and Development (EBRD)
A senior loan of up to USD 200 million with a tenor of up to 8 years (the "Loan") to Enerjisa Enerji Uretim A.S. (the "Borrower" or the "Company"), one of the largest independent power producers in Turkiye, with 4.2GW installed capacity.
- Status
- Under Construction
- Sector
- Geothermal, Power Generation (CCGT), Wind, Hydro, Warehouse, Solar, Hotel, Raw Materials, Commercial, Road, Residential
- Location
- Turkey
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Enerjisa Uretim Wind Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | disbursing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A senior loan of up to USD 200 million with a tenor of up to 8 years (the "Loan") to Enerjisa Enerji Uretim A.S. (the "Borrower" or the "Company"), one of the largest independent power producers in Turkiye, with 4.2GW installed capacity. |
Original sector | Energy |
Budget |
Location
Country | Turkey |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Geothermal, Power Generation (CCGT), Wind, Hydro, Warehouse, Solar, Hotel, Raw Materials, Commercial, Road, Residential |
Article published date | 2026-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Geothermal projects in Türkiye
- EFELER Geothermal Power Plant
- Zorlu - Kizildere III GPP Extension
- Aydem Renewables Green Bond (f. Project Vega)
- EQR: Enerjisa Distribution & Solar Projects
- Cimko Eurobond
- Two Face House / SO? Architecture and Ideas
- Can House / PIN Architects
- Well-Confined Mucosal LasEr Ablation with a Negative Pressure Based Endoscopy Capsule
