Engineering and Utilities Office Renovation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Office. GC Bids to Owner Public - Local November 24 at 02:00 PM (EST)
- Status
- Prospective
- Sector
- Electric Vehicles (EVs), Forest Products and Packaging, Power Generation (CCGT), Residential, Water Supply and Storage, Steel, Metal, Power Transmission, Commercial, Warehouse, Manufacturing (Industrial), Automotive, Waste Processing and Treatment, Cement, Rail, Road, Government
- Location
- Winston-Salem, North Carolina, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Engineering and Utilities Office Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Office. GC Bids to Owner Public - Local November 24 at 02:00 PM (EST) |
Original sector | Industry, Trade And Services |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Winston-Salem |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Forest Products and Packaging, Power Generation (CCGT), Residential, Water Supply and Storage, Steel, Metal, Power Transmission, Commercial, Warehouse, Manufacturing (Industrial), Automotive, Waste Processing and Treatment, Cement, Rail, Road, Government |
Article published date | 2026-11-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
