Engineering Design for future sewer separation and watermain replacement (Drummond Road, St. Peter Avenue, Fifth Avenue, and St. James Avenue)
Sector: Waste Processing and Treatment • Location: Ontario, Canada
Source: Infrastructure Canada
Design Project to determine engineering and costs required for future construction. Future construction includes sewer separation; this will reduce basement flooding from potential downstream and combined sewer overflow events. In addition, construction includes replacement of watermains and roads are in poor condition. Replace combined sewer with new sanitary sewers and new storm sewers. Watermai
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Road
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Engineering Design for future sewer separation and watermain replacement (Drummond Road, St. Peter Avenue, Fifth Avenue, and St. James Avenue)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design Project to determine engineering and costs required for future construction. Future construction includes sewer separation; this will reduce basement flooding from potential downstream and combined sewer overflow events. In addition, construction includes replacement of watermains and roads are in poor condition. Replace combined sewer with new sanitary sewers and new storm sewers. Watermain replacement and road reconstruction including new sidewalks, curb and gutter. Length and diameter of new storm sewers, sanitary sewers and watermain to be determined. Project includes new sanitary laterals with cleanouts at the property line and new water services with curb stops at the property line for a combined total of 78 lots. Hydrants will be replaced and/or added as needed. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Road |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
