logo

Engineering Design for future sewer separation and watermain replacement (Drummond Road, St. Peter Avenue, Fifth Avenue, and St. James Avenue)

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Design Project to determine engineering and costs required for future construction. Future construction includes sewer separation; this will reduce basement flooding from potential downstream and combined sewer overflow events. In addition, construction includes replacement of watermains and roads are in poor condition. Replace combined sewer with new sanitary sewers and new storm sewers. Watermai

Project Information FAQ

Project Information

5 Q
The project “Engineering Design for future sewer separation and watermain replacement (Drummond Road, St. Peter Avenue, Fifth Avenue, and St. James Avenue)” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Design Project to determine engineering and costs required for future construction. Future construction includes sewer separation; this will reduce basement flooding from potential downstream and combined sewer overflow events. In addition, construction includes replacement of watermains and roads are in poor condition. Replace combined sewer with new sanitary sewers and new storm sewers. Watermain replacement and road reconstruction including new sidewalks, curb and gutter. Length and diameter of new storm sewers, sanitary sewers and watermain to be determined. Project includes new sanitary laterals with cleanouts at the property line and new water services with curb stops at the property line for a combined total of 78 lots. Hydrants will be replaced and/or added as needed.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data