logo

Engineering Design for future sewer separation and watermain replacement (Drummond Road, St. Peter Avenue, Fifth Avenue, and St. James Avenue)

Completed · Ontario

Source: Infrastructure Canada

Project
Completed

Design Project to determine engineering and costs required for future construction. Future construction includes sewer separation; this will reduce basement flooding from potential downstream and combined sewer overflow events. In addition, construction includes replacement of watermains and roads are in poor condition. Replace combined sewer with new sanitary sewers and new storm sewers. Watermai

Status
Closed
Sector
Water Supply and Storage, Road, Waste Processing and Treatment, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Engineering Design for future sewer separation and watermain replacement (Drummond Road, St. Peter Avenue, Fifth Avenue, and St. James Avenue)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Engineering Design for future sewer separation and watermain replacement (Drummond Road, St. Peter Avenue, Fifth Avenue, and St. James Avenue)” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Design Project to determine engineering and costs required for future construction. Future construction includes sewer separation; this will reduce basement flooding from potential downstream and combined sewer overflow events. In addition, construction includes replacement of watermains and roads are in poor condition. Replace combined sewer with new sanitary sewers and new storm sewers. Watermain replacement and road reconstruction including new sidewalks, curb and gutter. Length and diameter of new storm sewers, sanitary sewers and watermain to be determined. Project includes new sanitary laterals with cleanouts at the property line and new water services with curb stops at the property line for a combined total of 78 lots. Hydrants will be replaced and/or added as needed.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Waste Processing and Treatment, Government

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project