logo

ENGLEBRIGHT DAM REACH/NARROWS REACH CHANNEL HABITAT RESTORATION, YUBA RIVER, CA

Sector: Hydro • Location: United States of America

Source: Grants.gov

Project
Archived

Phase 1 funding is available through the U.S. Fish and Wildlife Service Anadromous Fish Restoration Program to restore channel habitat in the Englebright Dam Reach (EDR) and Narrows Reach (NR) of the Yuba River (Yuba County), California. Fiscal Year 2011 (Phase 1) funding is to assess restoration alternatives and develop a planning document for the EDR and NR, and develop conceptual designs and i

Project Information FAQ

Project Information

5 Q
The project “ENGLEBRIGHT DAM REACH/NARROWS REACH CHANNEL HABITAT RESTORATION, YUBA RIVER, CA” is an infrastructure initiative in the Hydro sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

archived

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Phase 1 funding is available through the U.S. Fish and Wildlife Service Anadromous Fish Restoration Program to restore channel habitat in the Englebright Dam Reach (EDR) and Narrows Reach (NR) of the Yuba River (Yuba County), California. Fiscal Year 2011 (Phase 1) funding is to assess restoration alternatives and develop a planning document for the EDR and NR, and develop conceptual designs and initiate permitting for a restoration project. It is anticipated that habitat restoration actions would be incrementally implemented as funding becomes available. The following specific objectives are to be addressed in the proposal: 1. Evaluate multiple alternatives (i.e., in terms of cost-effectiveness, expected longevity, expected benefit to fish, etc.) among various potential habitat restoration activities in the EDR and NR (e.g., increasing spawning habitat through the removal of “shot rock,” coupled with implementing different frequencies or amounts of gravel augmentation). 2. Develop a reach-level, habitat restoration planning document including pre- and post-project monitoring for the EDR and NR of the lower Yuba River. 3. Develop conceptual designs and initiate permits for the preferred alternative

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data