logo

Engro Energy (Pvt) Limited

Sector: Waste Processing and Treatment • Location: Pakistan

Source: International Finance Corporation (IFC)

Project
Completed

The Engro project consists of the development, construction and operation of a 217 MW combined cycle power plant to be located in Qadirpur, District Ghotki, Pakistan. The power plant is expected to be a base load plant fueled by low btu (permeate) gas, which is currently being flared. The energy produced will be sold to the single buyer, National Transmission and Distribution Company (NTDC), on t

Project Information FAQ

Project Information

4 Q
The project “Engro Energy (Pvt) Limited” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Pakistan. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Engro project consists of the development, construction and operation of a 217 MW combined cycle power plant to be located in Qadirpur, District Ghotki, Pakistan. The power plant is expected to be a base load plant fueled by low btu (permeate) gas, which is currently being flared. The energy produced will be sold to the single buyer, National Transmission and Distribution Company (NTDC), on the basis of a 25-year Power Purchase Agreement. An associated gas pipeline (approx. 2 km right of way) is being is being designed, built and operated by Sui Northern Gas Pipeline Limited (SNGPL), Engro have no direct stake or involvement in pipeline construction. Notwithstanding, Engro will define a framework to help the company ensure national, local and IFC PS requirements with respect to land acquisition and compensation are met. NTDC’s power evacuation line (approx. 5 km long) will be designed by NTDC to comply with Asian Development Bank safeguards, which are consistent with IFC PS, including land acquisition and resettlement.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data